-
SF65 & SF55c door set requires 120mm Spindle for Lever/Lever handles
SF55e & SF70 door set requires 116mm Spindle for Lever/Lever handles
SF75eco door set requires 130mm Spindle for Lever/Lever handles
SF75c door set requires 150mm Spindle for Lever/Lever handles
These are drilled and cut in our factory at point of ordering, please allow 2 working days for delivery,
-
Charcoal Grey Metallic (DB703 Textured) is a nonstocked product, therefore, when placing this order, please allow a minimum of 10 working days for receipt of goods.
Stainless Steel Finish Lead time: Standard colour : Stocked product – this product will be dispatched within 2 working days via your chosen delivery method. Lead time: Non-Standard Colour: Non stocked product – there is a 5 week wait on non standard colour handles.